管理目标
Management Policy
分部分项工程一次校验合格率100%
The percent of theone-time acceptance of the branch and sub-item project shall be 100%
工程回访保修率100%
The repair rate ofthe project shall be 100% during the return visit
顾客调查满意率>95%
The satisfactionrate of the customer shall be over 95% in the survey
节约水、电的消耗,减少办公器具、材料消耗
The usage of water andpower shall be saved,theconsumption of office stationery and materialsshall be reduced
施工噪声、粉尘、有害气体、污水排放达标率100%
The discharge ofnoise dust,noxiousgases and sewage shall reach the standards by 100%
固体废弃物分类处理
Solid wastes shallbe disposed of according to their categories
安全文明施工评价达标率100%
The safe andcivilized construction rate got by appraisement shall be 100%
千人负伤率≤6‰
The injury rateshall not be over 6‰
避免职业病和死亡事故
The occupationaldisease and fatal accident shall be avoided
|